Its been awhile since the last set. Quite a bit has been done and its getting closer and closer to being finished. Still a lot of outside work to be done but it can wait till spring
First of all here is a link to the first set taken back in October. To bad todays weather wasn't like that beautiful day
http://www.simviation.com/cgi-bin/yabb/YaBB.cgi?board=photos;action=display;num=...There are a few changes though. Its accualy only a 3 bedroom, 4 bathroom. What we thought was a small bedroom is really a study
Tried to keep them somewhat in order as to then and now

Here is the front. Only a few things have changed. Some of that main roof was replaced about 2 weeks after the first shots. That nice day gave way to colder weather and the shingles never got a chance to seel well. A lovely storm with winds gusting to 70+ mph and hail hit the area. That roof was nearly ripped completely apart. One area even lost part of the plywood

Theres still a few shingles laying in the mud but the back yard is where the real disaster still lies.

Side looking pretty good now. By the time that storm had hit all the windows and doors were in and we had quite a bit of the vinyl siding done. This side took quite a beating...lost part of the siding, the upstairs and bottom left windows were blown out. That bloody storm left us a huge mess to clean up. Unfortunatly the weather only gave us a couple of pleasent days to work in


No longer do we walk into that bare skeleton. Now all the wires, heating, and most of the plumbing has been ran. Almost half the drywall is hung and things are moving along smoothly now. I was one of the 2 people who ran nearly all of the wire...and let me tell you these people are obsesed with outlets and switches. Its going to take forever to accualy connect them all. The master bedroom alone has 10 outlets, 5 switches, and a couple of other misc cables.

A view of the back from the same place only from ground level. There will be shutters on all the windows, but the cold moved us inside before we could get them up.

Living room. Youll have to excuse the mess. We arent exactly the most organized of people right now. Especialy since we dragged stuff in to save those many trips out into the 2-3°F temps awhile back.

First view from the upstairs. Its coming along about as fast as the downstairs. Not as much to do up here.

And last but not least...The garage. Mostly just for storing our materials right now, but I noticed the walls have now began to be drywalled.
Mudding and sanding is next on the list. Hopefully it will go fairly fast. I just dont look forward to accualy hooking up all of the outlets and switches. A friend and I have been rewiring my own house and I really dont want to mess with the 50 or so in this house

Wont be long though...Will be back outside enjoying hopefully nice weather. Have a little bit of the roof to repair and that dormer that still needs sided. All the gutters and other misc touch up work to go with it, the front porch should be getting railings and stairs, all doors are getting painted, and if theres enough time a little landscaping out front. So hopefully it will be finished by the end of May. We are a few days ahead of schedule so that will help.
Will try to get some more pictures when the inside is completed, and again when we finish the outside

And hopefully by the time of the open house in late May I will be able to post pics of the completed, move in ready house