First Piece of Cockpit Structure Constructed

I wasn't up to doing any "fussy" wiring type stuff....... and I am waiting for some 10K ohm slide potentiometers to arrive anyway.... so I thought I'd take a couple of hours and tackle the first item for the construction of the cockpit structure itself.

The first section I decided to build for this project is the "shelf" unit that will sit directly behind the center console structure.  All of the design work for the simulated cockpit has been worked out in a CAD program.... so all the dimensional stuff has been resolved there.  Dimensions were lifted directly from that drawing and translated to the real wood parts.

This shelf unit will hold a single "glass cockpit" video monitor at a 15 degree upward angle, will support the right side of the main panel facing tipped at a 15 degree angle, will serve as the support for the glareshield unit that will sit on top of it, and then be topped by one of the exterior display monitors.  The sizing of the various components has been designed so that the center of the exterior view display monitor lines up with my eye level when seated in the pilot's chair.

The monitor located on the middle shelf of this unit will display the engine management instruments.  There is room underneath at the floor leve l to hold two tower style PC's.

It is constructed out of two thicknesses of medium density fiberboard....... 3/4" for the two upright sides..... and 1/2" for the shelves themselves.  The span is so short that I do not think I need a brace under the center of the shelf that holds the monitors.... but if neccessary I will add a piece of 2" x 2" pine across the middle.  Small pieces of pine are used to secure the fiberboard, utilizing screws and glue on all joints.

The holes in the various sections are cut using a standard holesaw in a hand drill.  These are to be utilized as pass-throughs for any necessary wiring.

Photo #1

...

This shot shows the use of Elmer's Glue in addition to screws for making the structure rigid.  MD fiberboard is weird stuff.  It tends to want to "rip apart" if you put too much stress on it.  The glue helps.  The wood strips are used to allow you to screw into the face of the fiberboard...... not drill into the edges.


Photo #2

...

Here you can see the center monitor shelf screwed securely to the pine furring strip that has been itself screwed to the side upright piece.  Again, glue was used for all joints.  The narrow board at the botton serves to stabilize the lower rear "legs" of the shelf.  The front does not get any, since PC CPU's will get placed in here.  The center console will locate directly in front of this part too.

Photo #3

...

Here is one view of the completed first shelf unit.  



Photo #4


...

Here is a second view of the same unit.  The location of most holes for the wiring can be seen.

None of this structure will be visible from the cockpit.  It will all be hidden behind the main panel facing, the center console, and the glareshield.

So....... get out your carpentry tools and join me folks  Wink.  About $12 USD of wood and screws and glue and 2 hours of time.


best,

................john
« Last Edit: Mar 17th, 2004 at 11:06pm by JBaymore »  

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #1 - Oct 30th, 2003 at 3:45pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Quote:
Starting to look interesting there John.

Will

 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #2 - Oct 30th, 2003 at 3:47pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Thanks Will.  Smiley

I may get another couple of hours tonight to tackle starting the next cockpit section.  Next part of the cockpit itself to make is the center console.  That will be a litle more complex... but not much.

The problem is that I am trying to cram in one more VDT down there (  Wink ) in the center console for a FMC or a radar display.  The logical place it should go puts it on the slanted part right next to where the center console butts up against the main panel facing.  But I can't put my hands on something like a 7" or 9" dirt cheap monitor right now.  I've got a small monochrome one that has a 7 3/4" x 10 1/4" screen... in a 11 1/2" x 13" "box".  But that size puts the font edge of the throttle quadrant back about 13" from the panel face.  I am thinking that is a little too far back for comfort for the right arm to conveniently reach it.

The real time consuming stuff with all of this will come when I have to do the wiring for all the switches and stuff.  Wink

You off your night shift thing yet?

best,

....................john
 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #3 - Oct 30th, 2003 at 3:49pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Quote:
You need some cheap flat screen monitors really, but where you get them from I've no idea.  I was sent home sick from my fourth night and have been feeling rank for a few days so at the moment design work has been suspended.  I have made a list of all of the possible key commands and listed them in excel.  I have removed from the list all of those that I want to use an axis for and that don't apply for a cessna (afterburner etc).

Currently the list is 80 functions but this would include a "working Radio" in addition to a console.  I just need an old keyboard now.

Will

 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #4 - Oct 30th, 2003 at 3:51pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Construction Started On Cockpit Center Console

I managed to steal about 3 hours last night from 10 PM to 1 AM to get started on constructing the center console portion of my simulated cockpit.  The basic construction techniques here are the same as what was done for the part that I documented in a post prior to this one in this thread.

All of the design work was done in my CAD program and I again just transfered the dimensions onto the wood.  The center console is constructed mainly out of 1/2" medium density fiberboard, with 1/8" fiberboard "whiteboard" material for the panel facings.  All of the main wood for the console came out of 1/2 of a 4' x 8' sheet.  It is screwed and glued using scrap pine furring strips.  Total cost for this part was again about $12 USD.


Photo #1
...

As You can see in Photo #1 above...... I spent some time playing with the monitor that I want to add in here as a FMC / TCAS radar display.  Here I am checking to make sure that the dimensions are going to match the CAD design....... because I did not leave a lot of room here for this!  The paper CAD plans are in the foreground.  The already partially built throttle quadrant was also used to help visualize if this is going to all work out OK  Wink.

I really want to have that extra monitor in this console.  There are just too many things that you need to display in a large jet cockpit  Wink.  This will bring the number of monitors for the "glass cockpit" part of this cockpit project to four.  It will be driven by my old Tcera laptop...... which is small and can be tucked into a nook somewhere.

The monitor I am utilizing here is one I picked up at the dump a week and a half ago.  People just throw this kind of thing out.  It is a 7 3/4" x 10 1/4" display, monochrome white, 604 x 480 vga display in perfect working condition.  The monochrome is perfect for a TCAS type display...... although I would have prefered green, not white.  "One man's junk is another man's........ "

To save space in the console I decided to strip the housing off most of the monitor.  I just left the facing portion on the monitor to serve as a "flange" to mount it in the wood construction.  If you are following this project and decide to do this also....... be vary careful with opening monitors!  They can have pretty lethal charges still in them even when unplugged.  Watch how you handle them.  And the picture tube can implode badly if you bang it on anything.



Photo #2
...

Photo #2 shows the two main side panels cut out.  Note the sloping upper console section.  This area takes the most planning.  The edges of the boards you use must have the same slope so that the facing fits against it correctly.  Using a skillsaw at an angle is sufficient for these cuts..... you don't NEED a tablesaw.

The two side pieces were cut out and then set "back to back" to compare the cuts.  Slight adjustment was done with a saber saw so that the two matched as well as possible.

With careful planning the "scrap" from the two side panels will make all the other pieces.



Photo #3
...

In photo #3 you can see the trickiest cut in the project.  This large flat sheet with the bevel cut edge is the top rear console wall.  This angled cut has to match the slope of the upper portion ofthe console.  I used the skillsaw set at an angle.  The corner braces also have to be cut at an angle to match.  You can see the "screw and glue" construction here too.



Photo #4
...

In photo #4 you see the rear console wall where it butts up against the main panel support structures.  This section is cut out to allow good air circulation for the FMC/TCAS monitor that will be located there.  I will also likely install some boxer fans near each monitor in the setup (with "real" cooling controls located on the overhead panel) to help keep them all cool.  The holes in the bottom serve for more wiring passthroughs.  The corner construction of the "box" is also evident here.



Photo #5
...


Photo #5 shows the internal structure of the console a bit.  The wall that separates the lower console from the upper part does not go all the way to the bottom.  This will allow the lower area to be utilized to store all manner of electronic stuff.  It also facilitates wiring passthrough.  The "dividing wall" will get a strip of furring along it at the level of the lower panel facing to help support that material.

This lower section will eventually get some internal dividing and supporting walls.  These will be spaced to match the electronics that will get installed there.  I already know that on the lower left... next to the pilot seat...... there will be a section set up to take a couple of Goflight radio units.  So there will be a wall set up to support them on their panel mounting width of 7 1/4".



Photo #6
...


In photo #6 you can see the "stripped" monitor set in place in the upper center console.  The mount is simply two furring strips screwed into the console walls at the appropriate height so that the monitor face is flush with the console face.  The console panel facing will go over this...and have a cutout for the display screen.  The monitor is "friction fit" here.... no mounting screws or anything..... it just sits on the flange created by the wood.  It's quite stable 'cause the fit is so tight all around  Wink.  But it is easily lifted in and out for doing any work.  The two screws on the left side of the "mount" are evident on the dividing wall.  They will be covered by the throttle quadrant.



Photo #7
...

In photo #7 you see the center console from the rear, showing the monitor in place.  The ease of access to the monitor workings is self evident.  Also the wiring passthrough holes.  The monitor does NOT project beyond the outside of the rear wall..... so that the console will butt up flush with the other support structures for the main panel.



Photo #8
...

Photo # 8 shows the state of the project at this time.  The center console has had the sheets of 1/8" fiberboard "whiteboard" cut and put in place.  The hole for the monitor display in the upper panels section was cut out by drilling holes at the corners and then cutting with a sabre saw.  The throttle quadrant is just sitting on top of the lower console section at the moment.  The center console in this picture is butted up into its desired position next to the shelf unit that will hold the engine management display monitor and glaresheild (see prior posting in this thread).


So..... there you have the details about the status of my crazy "homebrew simulated cockpit" efforts so far.  There are 5 hours of labor so far into the cockpit "framing" part of this project.  Hope this documentation is inspiring someone else to "take the plunge" with this kind of thing Grin.  Undertaking this project is an incredible amount of fun!  And I haven't even FLOWN in it yet!

More as it all develops.


best,

.....................john
 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #5 - Nov 3rd, 2003 at 12:56pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Next Piece of Cockpit Structure Constructed

Got a little time and built the next piece of the shelf support structures that will act as the "bones" in the simulated cockpit.

This shelf unit will sit directly in front of the pilot and butted up to the left side of the structure shown above before this message.  The pedals will be under it in the center of the lower opening.  Two VGA monitors will be sitting on it on the middle shelf.  The top will get the display monitor...... and help support the glare shield assembly.

Again as all the others before it in this thread...... screw and glue out of MDFiberboard with scraps of pine for structural attachment points.  Holes are for wiring passthroughs and for ventilation.  The holes line up from unit to unit.

The lower opening where the pilot's legs will go will likely get a center structure to "divide" the pedal access area.  This won't be done until the pedals themselves are dimensioned.  There will likely also be some "facing" on the lower opening edges to finish it off visually and also for mounting some controls lower down.

Photo #1
...

Photo #1 shows pieces cut out with skillsaw and jigsaw, drilled, and the start of the "screwing and gluing" process.


Photo #2
...

Photo #2 shows the middle shelf member and the leg supports in place on one end.  Now just to add the other side.


Photo #3
...

Photo 3# is from the rear.  The two narrow strips are for stabilizing the "legs" of the shelf.  When the cockpit is finished, there will be a "false wall" on the inside of the leg well that covers these from view.


Photo #4
...

Photo #4 shows the completed structure. 


The next thing to do will be to construct the coverings for the main face of the panel, then build the left sidestick area, and then the glareshield assembly.  After that....  tackle the overhead panel.

So...... ever onward.

best,

...................john
 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #6 - Nov 3rd, 2003 at 1:28pm

Vchat20   Offline
Colonel
Living in my virtual reality
so you don't have to.

Gender: male
Posts: 57
*****
 
quick question: exactly what cockpit are you trying to build? is it supposed to be a fighter cockpit, cessna, etc..?
 
IP Logged
 
Reply #7 - Nov 3rd, 2003 at 2:49pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Vchat,

Sorry...... when I tried to "break up" the big massive "one topic fits all" forum creation survey thread ......... some of the messages just got left there cause people didn't move them.  So some continuity in the topics that are starting off with the (repost) appended to them are missing some info that got discussed there.

What I am building is a "generic" heavy jet cockpit.  It is based loosely on the BAe 146-200 plus the Airbus 3XX.  It will be a four engine capable setup.  By not trying to create and "exact" copy of any aircraft..... I save myself thousands and thousands of dollars to start with   Grin.

I am modeling only the left seat position up to the copilots side of the center pedestal.  I don't have the space to add the right seat..... and no one to sit there anyway   Wink.  Because it is modular...... I could always add the right seat in the future....by just duplicating the stuff on the left of the center console over on the right.  That just about doubles the cost.  Plus then to be realistic.....you have to mechanically (or electronically) link the yokes.  Expensive!

Hope that answers your questions.

best,

.................john
 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #8 - Nov 16th, 2003 at 4:09pm

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
This part of the construction project is now continued in the thread labeled "Cockpit Main Support Construction Part Two"..


best,

.............john
 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #9 - Mar 16th, 2004 at 10:10am

JBaymore   Offline
Global Moderator
Under the curse of the
hombuilt cockpit!

Gender: male
Posts: 10261
*****
 
Putting a message here so that this thread pops back toward the top.... to complement the new posting I just did on the further status of the construction.  Just noticed that some of the pictures that I used have somehow gotten garbled with other pictures in these older threads.... I'll try to fix that soon.

best,

....................john
 

... ...Intel i7 960 quad 3.2G LGA 1366, Asus P6X58D Premium, 750W Corsair, 6 gig 1600 DDR3, Spinpoint 1TB 7200 HD, Caviar 500G 7200 HD, GTX275 1280M,  Logitec Z640, Win7 Pro 64b, CH Products yoke, pedals + throttle quad, simpit
IP Logged
 
Reply #10 - Jun 20th, 2005 at 11:36pm

Imzzaudae   Offline
Colonel
I love YaBB 1G - SP1!

Posts: 52
*****
 
Wow J
Nice pit man. Love it.

What more can I say.

Thanks for sharing some great Ideas
Imz
 
IP Logged
 
Page Index Toggle Pages: 1
Send Topic Print